Posts

Showing posts from September, 2018

Schedules and Waiting

Image
Photo Credit P Babin As we wait for the excavation contractor to become available we watch the weather forcast for next week.   Had a great week/weekend with visits from Andre from Quebec,  Peter, Claudette, Chloe and Pheobe (rented the cottage next door), then Mom and Ann Fulton for a night only.    We had our first sleep over, a fire in the stove and coffee on the balcony!    Finished tiling/grouting the bathroom.  More mudding in the shop, brush and tree clearing, etc.  Andre, Michel and Linda - mussels. Trying the tub and toilet in the bedroom. Andre and Michel The beautiful crooked dock Ash floor boards stacked for winter.  

And So on...

Image
Tub with a view Dry fitting top.  Volunteer napping on the job.