Balcony Railing & Sawdust

Image
Interior ceilings are in.  Tiles for bathroom wall purchased.  Watching YouTube DIY videos.....  Balcony railing installed.   Lots of tedious milling of ash floorboards.  Milling ash lumber for flooring. Balcony railing installed! Zoom Retaining wall/steps delivery.  

Occupancy

Image
And the deadline for getting our Occupancy Permit gets closer. Most of the ceiling has been covered on the main floor.  Michel is working on covering the insulation in the shop/garage walls.  I'm following behind with filler.  Still plodding through trying to get the excavation started - cautiously optimistic about the latest plan for the retaining 'steps'. The glass/railing for the balcony arrived on Saturday.   We still have a sense of humour...

Railings, putty and paint.

Image
Next round of "volunteers"... Linda Picot all the way from Vancouver Island.  We are so fortunate!   Lots of sanding, filling and paint (still primer!) happening.   Other boards being stripped and sanded for some ceiling,  Michel got the temporary railing done in the loft (storage area).   Forgot to get a photo of the bathroom door...    Peter came down last weekend and got the shower 98% installed!  Starting to look like a bathroom.